Skip to the page
extrua
← Free tools

Free toolbox talk template

By Stephen Billingsly · Updated

A toolbox talk is a short safety conversation with the crew, held where the work is. This template records one on a single page: the topic, what the crew raised, who is fixing it, and a signature from everyone who was there. Fill it in here or print it blank. Nothing you type is sent or saved.

1. The talk

The business holding the talk.

Where the crew is working today.

The day of the talk.

When it started.

Who ran the talk.

One topic. Short enough to say in a breath.

2. What was covered

Three or four points is plenty. Leave this empty to print blank lines and write them by hand at the talk.

3. What the crew raised, and what happens next

This is the part that matters. Every issue gets an action, a name and a day. Blank rows print as empty lines to fill in by hand.

  1. Issue 1

4. Print it and have everyone sign

The printed sheet is one A4 page: the talk, the points, what was raised and who is fixing it, and a line for each person. Print it blank to fill in by hand at the talk, or fill it in here afterwards. In the print window, choose Save as PDF to keep a copy.

Before you print: there is no topic, there is no date.

Toolbox talk record

Your business: Site or job:
Date: Time:
Led by: Topic:

What was covered

What the crew raised, and what happens next

What was raisedWhat will be doneWhoBy when

Who was there

I was at this talk and had the chance to speak.

NameSignature

Template from extrua.com.au/tools/toolbox-talk-template. The content is the business’s own.

This is general information, not legal advice. A reload clears the form, so print or save it before you leave the page.

How to run a toolbox talk in ten minutes

  1. Pick one topic, and pick it from this week’s work, not from a list of everything.
  2. Hold it where the work is. People point at things when they can see them.
  3. Say the two or three points you came to make. Then stop talking.
  4. Ask what people have noticed, and wait. The first answer usually takes a while.
  5. For each thing raised, agree what will be done, by whom and by when. Write it down in front of them.
  6. Have everyone sign, and start the next talk by reading out last time’s actions.

The fifth step is the one that decides whether the next talk is worth holding. A crew that raises a broken ladder and sees it replaced by Thursday will speak up again. A crew that raises it and hears nothing will sign the sheet and say nothing.

What to write down

Enough that someone who was not there can tell what was said and what was promised: the date and site, who led it, the topic, the points made, each issue the crew raised with its action, name and day, and who was there. One page does it. Keep the sheets together, in date order, where you can find one when a client, a builder or an insurer asks.

Topics to pick from

These are prompts, not scripts. The useful talk is about something on this site, this week. What is dangerous about it, and what to do, is for the people doing the work to say.

  • Something that went wrong, or nearly did, since the last talk
  • What is different about today's site or today's job
  • A new person on the crew, and what they need to know here
  • A new tool, machine, product or chemical
  • Working at height on this job
  • Lifting, carrying and awkward spaces
  • Heat, cold, sun and wet weather
  • Leads, power tools and the switchboard
  • Vehicles, traffic and parking at the site
  • Working alone, and who knows where you are
  • The public, tenants or the client's staff nearby
  • Where the first aid kit is and who to call

A toolbox talk and a SWMS

They do different jobs. A safe work method statement is a written document for high risk construction work, and the regulations say what it must contain. A toolbox talk is the conversation. The morning talk is a good time to go through the day’s SWMS with the people about to do the work. There is a free SWMS template on this site too.

Signed on the phone, not in the ute

In Extrua Dispatch you upload each SWMS once. Every worker signs it on their phone, and signs again when you issue a new version. It is free on every plan.

What the law asks of you

This page does not state the law on toolbox talks. Nothing was read from an Act or a regulation for it, so it does not say whether a talk is required, how often to hold one or how long to keep the record. Each state and territory has its own work health and safety regulator, and each explains what an employer has to do to talk with workers about safety.

FAQ

What is a toolbox talk?

A toolbox talk is a short safety conversation with the crew, held where the work is, usually before the day starts. It covers one topic, lets people raise what they have noticed, and ends with who is going to fix what.

How long should a toolbox talk be?

Short. Five to ten minutes on one topic is enough for most crews. A talk that runs long loses the room, and a talk on five topics is remembered for none of them.

What should a toolbox talk record include?

The date, the site, who led it, the topic, the points made, anything the crew raised, what will be done about each thing and by whom, and the name and signature of everyone who was there. This template prints all of that on one page.

Is a toolbox talk the same as a SWMS?

No. A safe work method statement is a written document for high risk construction work, and the regulations say what it must contain. A toolbox talk is a conversation. A talk is a good time to go through the SWMS for the day's job with the people doing it.

Are toolbox talks required by law?

This page does not state the law on toolbox talks, because the rules were not read at source for it. Each state and territory has its own work health and safety regulator, and each explains what an employer has to do to talk with workers about safety. The links on this page go to all eight.